← Founder Notes
Archive

The dam is now being asked to file its own integrity report

Yethikrishna ROriginal on Threads

the dam is now being asked to file its own integrity report: a physics informed multimodal network fuses electrical resistivity and seismic data to detect hidden embankment cracks after training on a synthetic simulation engine, an operational chinese hydropower platform runs drone computer vision inspections around the clock, and a cnn lstm model reads sentinel 1 radar stacks to predict long term dam body deformation.

the wall now files its own health diary.

Provenance

The note above is reproduced unedited from the original post, first published on Threads on 4 October 2026 at 12:16 IST.

View the original post
Embed this note
<iframe src="https://founder.myndlabs.tech/notes/embed/the-dam-is-now-being-asked-to-file-DeEBf_sjHWh" width="480" height="420" style="border:0;max-width:100%" loading="lazy" title="The dam is now being asked to file its own integrity report"></iframe>

More notes